Drying Log Software: Daily Documentation Without the Friday Panic
A practical guide to daily drying logs: psychrometric readings, equipment placement and organized documentation for review.
The Friday panic is universal in water restoration: you're pulling equipment off a five-day dry-out and realize nobody logged Wednesday's readings. Now you're reconstructing psychrometry from memory before the adjuster asks.
What a real drying log tracks
- GPP (grains per pound) inside, outside, and unaffected reference
- Temperature and RH per affected room, once per day
- Material moisture readings on the same wall locations each day
- Equipment placement: air movers, dehus, HEPA, with model and serial
- Photos of the equipment in place, dated automatically
Why the daily cadence matters
Readings taken at consistent locations and times help document changing conditions and equipment use. Explain gaps and equipment changes so a reviewer can follow the record; documentation does not guarantee claim approval.
A repeatable daily visit
Use the same monitoring points and recording sequence on each visit. Record the readings, relevant photographs, equipment changes and notes your project requires.
Our restoration calculators and water damage toolkit support equipment planning and the general job record. Keep daily drying documentation in your existing system or use our free drying worksheet. For the underlying standard, see ANSI/IICRC S500.
Keep reading
How to Replace Spreadsheets Without Losing Job History
A step-by-step migration approach for restoration companies moving off spreadsheets: what job history to carry over, what to archive, and how to keep crews working during the switch.
Restoration CRM vs. Generic Field-Service Software
Field-service platforms handle scheduling and customers well. Restoration work adds drying logs, lab results, and clearance. Here's where the two diverge and how to choose.